(清空日期可显示全部记录)
标准编号 | 标准名称 | 发布日期 | 实施日期 | 废止日期 | 替换信息 |
---|---|---|---|---|---|
ASTM D7377-09(2013) | Standard Practice for Evaluating the Water Wash-Off Resistance of Traffic Paints using a Water Faucet | 2013-11-01 | |||
Hgf2014-024 | 高寒草炭土区水泥搅拌桩复合地基施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
ASTM D7396-14 | Standard Guide for Preparation of New, Continuous Zinc-Coated (Galvanized) Steel Surfaces for Painting | ||||
Hgf2014-025 | 季节性冻土地区复杂地质条件下富水公路隧道冬季施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
Hgf2014-026 | 季节性冻土地区复杂地质条件下富水公路隧道保温出水口施工工法 | 2016-06-30 | 2016-06-30 | 2021-06-30 | |
Hgf2014-027 | 短气囊封堵大管径雨水管道施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
Hgf2014-028 | 严寒地区钢混叠合梁上部结构施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
ASTM D7489-09(2013) | Standard Practice for Evaluating Touch-Up Properties of Architectural Coatings under Various Environmental Conditions | 2013-07-01 | |||
Hgf2014-029 | 预制梁板钢筋保护层圆形垫块施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
ASTM D7514-14 | Standard Test Method for Evaluating Ink Stainblocking of Architectural Paint Systems by Visual Assessment | 2014-01-01 | |||
ASTM D7538-09(2013) | Standard Practice for Evaluating the Water Wash-Off Resistance of Traffic Paints Using an Atomizing Spray Device | 2013-11-01 | |||
ASTM D7539-10(2015) | Standard Practice for Using a Test Chamber for Humidity Conditioning of Test Panels of Pavement Marking Paints | ||||
ASTM D7639-10(2014) | Standard Test Method for Determination of Zirconium Treatment Weight or Thickness on Metal Substrates by X-Ray Fluorescence | ||||
ASTM D7734/D7734M-13 | Standard Test Method for Determination of Open Time of Oxidative Printing Inks and Overprint Varnishes by a Manual Method | 2013-11-01 | |||
ASTM D7735-11e1 | Standard Test Method for Type A Durometer Hardness Testing of Road Marking Thermoplastic at Elevated Temperatures | 2011-11-01 | |||
Hgf2014-030 | 现浇梁桥台耳背墙施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
ASTM D7786-13 | Standard Test Method for Determining Enamel Holdout | 2013-11-01 | |||
Hgf2014-031 | 高寒地区钻孔桩冰上筑岛平台施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
ASTM D7787/D7787M-13 | Standard Practice for Selecting Wood Substrates for Weathering Evaluations of Architectural Coatings | 2013-06-01 | |||
Hgf2014-032 | 水泥混凝土路面加宽施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
ASTM D7834-13 | Standard Test Method for Filling Material Shedding of Paint Brushes | 2013-06-01 | |||
ASTM D7835/D7835M-13 | Standard Test Method for Determining the Solvent Resistance of an Organic Coating using a Mechanical Rubbing Machine | 2013-07-01 | |||
ASTM D7868-13 | Standard Practice for Determining the Dry Fall (Fog) Properties of Protective Coatings | 2013-06-01 | |||
ASTM G6-07(2013) | Standard Test Method for Abrasion Resistance of Pipeline Coatings | 2013-06-01 | |||
ASTM G9-07(2013)e1 | Standard Test Method for Water Penetration into Pipeline Coatings | 2013-06-01 | |||
ASTM G12-07 (2013) | Standard Test Method for Nondestructive Measurement of Film Thickness of Pipeline Coatings on Steel1 | 2013-06-01 | |||
ASTM G13/G13M-13 | Standard Test Method for Impact Resistance of Pipeline Coatings (Limestone Drop Test) | 2013-11-01 | |||
Hgf2014-033 | 水泥高压注浆防水幕墙围堰施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
ASTM G17-07(2013) | Standard Test Method for Penetration Resistance of Pipeline Coatings (Blunt Rod) | 2013-06-01 | |||
Hgf2014-034 | 富冰冻土水稳桩施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
Hgf2014-035 | 预应力空心板梁聚苯乙烯泡沫芯模施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
ASTM G18-07(2013) | Standard Test Method for Joints, Fittings, and Patches in Coated Pipelines | 2013-06-01 | |||
Hgf2014-036 | 海湾涌潮区桥梁大承台深基坑钢板桩围堰施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
Hgf2014-037 | 路基封层顶浆碾压施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
Hgf2014-038 | 密实卵石砾砂层旋挖钻机成桩施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
ASTM G55-07(2013) | Standard Test Method for Evaluating Pipeline Coating Patch Materials | 2013-06-01 | |||
Hgf2014-039 | 高寒地区钻孔平台冬季施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
ASTM G62-14 | Standard Test Methods for Holiday Detection in Pipeline Coatings | ||||
Hgf2014-040 | 沼泽地钻孔桩冬季施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
Hgf2014-041 | 膨胀土、冻胀土地区石笼网柔性挡土墙施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
ASTM G62-07(2013) | Standard Test Methods for Holiday Detection in Pipeline Coatings | 2013-06-01 | |||
Hgf2014-042 | 冻土路基冷却法施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
ASTM G95-07(2013) | Standard Test Method for Cathodic Disbondment Test of Pipeline Coatings (Attached Cell Method) | 2013-06-01 | |||
Hgf2014-043 | 超高层建筑物机电层大型设备吊装施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
Hgf2014-044 | 竖井内三面贴近墙风管安装工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
Hgf2014-045 | 数字集群型无线对讲信号覆盖系统施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
Hgf2014-046 | 承压输水铸铁管道不停产“套袖”法开孔连头施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
Hgf2014-047 | 钻爆隧道小断面大口径双管施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
Hgf2014-048 | 10000m3以下大型储罐机械联合作业倒拆施工工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 | |
Hgf2014-049 | 三角承插式网壳地面组装整体提升工法 | 2015-06-30 | 2015-06-30 | 2021-06-30 |
若您对上表中数据有任何疑问,请与网站联系。