| 标准编号 | 标准名称 | 发布日期 | 实施日期 | 废止日期 | 替换信息 |
|---|---|---|---|---|---|
| GDGF185-2015 | 大面积凹凸不平基面湿铺自粘聚合物改性沥青防水卷材施工工法 | 2016-05-16 | 2016-05-16 | ||
| GDGF186-2015 | 高速公路改性沥青SMA-16玛蹄脂路面采用砂岩和机制砂施工工法 | 2016-05-16 | 2016-05-16 | ||
| GDGF187-2015 | 高层住宅中间层悬挑脚手架拆除施工工法 | 2016-05-16 | 2016-05-16 | ||
| GDGF188-2015 | 一种新型人造石板材穿透支承连接施工工法 | 2016-05-16 | 2016-05-16 | ||
| GDGF189-2015 | 单元式抗台风SGP夹胶玻璃门窗施工工法 | 2016-05-16 | 2016-05-16 | ||
| GDGF190-2015 | 分级导流式生态透水混凝土系统施工工法 | 2016-05-16 | 2016-05-16 | ||
| GDGF191-2015 | 古建筑修缮之菠萝格木结构施工工法 | 2016-05-16 | 2016-05-16 | ||
| GDGF192-2015 | 用边墙挤压机浇筑路缘石施工工法 | 2016-05-16 | 2016-05-16 | ||
| GDGF193-2015 | 大跨度悬挑玻璃肋全玻璃幕墙施工工法 | 2016-05-16 | 2016-05-16 | ||
| IEC 60825-1 2007(2011) | Safety of laser products – Part 1: Equipment classification and requirements | 2007-03-01 | |||
| D-ZD2010 | 发电厂汽水管道支吊架设计手册 | 2011-05-01 | 2011-05-01 | ||
| GDGF194-2015 | 异形金属幕墙挂接安装施工工法 | 2016-05-16 | 2016-05-16 | ||
| BS EN 60870-5-101:2003+A1:2016 | Telecontrol equipment and systems —Part 5-101: Transmission protocols — Companion standard for basic telecontrol tasks | ||||
| GDGF195-2015 | 排水减压结构抗浮施工工法 | 2016-05-16 | 2016-05-16 | ||
| IEC 60870-5-102 1996 | Telecontrol equipment and systems - Part 5:Transmission protocols - Section 102: Companion standard for the transmission of integrated totals in electric power systems | 1996-06-01 | |||
| GDGF196-2015 | 深厚硬岩钻孔灌注桩大直径潜孔锤成桩综合施工工法 | 2016-05-16 | 2016-05-16 | ||
| BS EN 60870-6-101:1996 | Telecontrol equipment and systems Part 5. Transmission protocols | ||||
| IEC 60870-5-103-1997 | Telecontrol equipment and systems – Part 5-103: Transmission protocols – Companion standard for the informative interface of protection equipment | 1997-12-01 | |||
| IEC 60947-3 Edition 3.2 2015 | Low-voltage switchgear and controlgear – Part 3: Switches, disconnectors, switch-disconnectors and fuse-combination units | 2015-07-01 | |||
| IEC 60986 Edition 2.1 2008 | Short-circuit temperature limits of electric cables with rated voltages from 6 kV (Um = 7,2 kV) up to 30 kV (Um = 36 kV) | 2008-11-01 | |||
| IEC 61140 Edition 4.0 2016 | Protection against electric shock – Common aspects for installations and equipment | 2016-01-01 | |||
| JJG(交通) 076-2010 | 车载式路面激光车辙仪检定规程 | 2010-06-13 | 2010-08-01 | ||
| IEC 61140-2001 | Amendment 1 Protection against electric shock - Common aspects for installation and equipment | 2004-10-01 | |||
| IEC 61173-1992 | Overvoltage protection for photovoltaic (PV) power generating systems - Guide | 1992-08-01 | |||
| GDGF197-2015 | 海上平台嵌岩灌注斜桩成桩综合施工工法 | 2016-05-16 | 2016-05-16 | ||
| IEC 61215-1 Edition 1.0 2016 | Terrestrial photovoltaic (PV) modules – Design qualification and type approval – Part 1: Test requirements | 2016-03-01 | |||
| IEC 61215-1-1 Edition 1.0 2016 | Terrestrial photovoltaic (PV) modules – Design qualification and type approval – Part 1-1: Special requirements for testing of crystalline silicon photovoltaic (PV) modules | 2016-03-01 | |||
| IEC 61215-2 Edition 1.0 2016 | Terrestrial photovoltaic (PV) modules – Design qualification and type approval – Part 2: Test procedures | 2016-03-01 | |||
| GDGF198-2015 | 岩石静爆孔钻凿降尘施工工法 | 2016-05-16 | 2016-05-16 | ||
| GDGF199-2015 | 种植屋面暗砌排水沟变形缝施工工法 | 2016-05-16 | 2016-05-16 | ||
| IEC 61284-1997 | Overhead lines - Requirements and tests for fittings | 1997-09-01 | |||
| GDGF200-2015 | 剪力外墙钢木组合模板施工工法 | 2016-05-16 | 2016-05-16 | ||
| IEC 61386-22-2002 | Conduit systems for cable management – Part 22: Particular requirements – Pliable conduit systems | 2002-02-01 | |||
| GDGF201-2015 | 轻质方形芯模空心楼盖施工工法 | 2016-05-16 | 2016-05-16 | ||
| IEC 61386-23-2002 | Conduit systems for cable management – Part 23: Particular requirements – Flexible conduit systems | 2002-02-01 | |||
| GDGF202-2015 | 主体结构自承压基坑逆作法施工工法 | 2016-05-16 | 2016-05-16 | ||
| BS EN 62271-103:2011(2013) | High-voltage switchgear and controlgear Part 103: Switches for rated voltages above 1 kV up to and including 52 kV | ||||
| GDGF203-2015 | 内墙新型彩色混凝土预制饰面板干挂施工工法 | 2016-05-16 | 2016-05-16 | ||
| GDGF204-2015 | 基坑狭窄区域回填密实施工工法 | 2016-05-16 | 2016-05-16 | ||
| BS EN 62271-106:2011(2014) | High-voltage switchgear and controlgear Part 106: Alternating current contactors, contactor-based controllers and motor-starters | ||||
| GDGF205-2015 | 地铁深基坑工程中格构柱、抗拔桩兼作降水井三合一施工工法 | 2016-05-16 | 2016-05-16 | ||
| GDGF206-2015 | 满堂支架流体仿真模拟预压施工工法 | 2016-05-16 | 2016-05-16 | ||
| GDGF207-2015 | 钢纤维聚合物结构混凝土箱梁施工工法 | 2016-05-16 | 2016-05-16 | ||
| GDGF208-2015 | 复杂地质条件下超浅埋暗挖隧道CRD优化施工工法 | 2016-05-16 | 2016-05-16 | ||
| IEC 61558-1 CORR 2-2010 | Safety of power transformers, power supplies, reactors and similar products – Part 1: General requirements and tests | ||||
| GDGF209-2015 | 直投颗粒状彩色沥青路面施工工法 | 2016-05-16 | 2016-05-16 | ||
| BS IEC 60287-1-1:2006+A1:2014 | Electric cables — Calculation of the current rating — Part 1-1: Current rating equations (100 % load factor) and calculation of losses — General | ||||
| IEC 61558-1 CORR 3 2011 | Safety of power transformers, power supplies, reactors and similar products – Part 1: General requirements and tests | ||||
| GDGF210-2015 | 全套管全回转与旋挖钻在岩溶地区大直径超长桩联合施工工法 | 2016-05-16 | 2016-05-16 | ||
| BS IEC 60287-1-1:2006 | Electric cables — Calculation of the current rating — Part 1-1: Current rating equations (100% load factor) and calculation of losses — General |