(清空日期可显示全部记录)
标准编号 | 标准名称 | 发布日期 | 实施日期 | 废止日期 | 替换信息 |
---|---|---|---|---|---|
UIC A122 RP 10:1973 | Investigation Of Tractive Units Equipped With Choppers - Test With Several Railcars On The 3 Kv D.c. System Of The Sncb | ||||
UIC A122 RP 12:1974 | Studies With D.c. Chopper Controlled Trainsets Tests On The Ns 1,5 Kv D.c. Power Supply System | ||||
UIC A122 RP 11:1973 | Studies And Results Of Interference Caused By Thyristor Locomotives Working On 25 Kv, 50 And 60 Hz | ||||
UIC A122 DT 93:1979 | Untersuchung Der Ausbreitung Und Ueber- Lagerung Von Stromrichter-oberschwin- Gungen Im Bahnnetz 16 2/3 Hz Sowie Von Moeglichkeiten Zur Daempfung Der Fahr- Leitungs-resonanzschwingungen, Aufge- Stellt Vom Ore-sva A 122 | ||||
UIC A122 DT 72:1978 | Distribution Of The Overhead Line Current Between Rail And Ground Depending On The Frequency And The Distance Of A Train From The Sub- Station, By Ore Specialists Committee A 122 | ||||
UIC A122 DT 64:1978 | Measurement Of Interference In Railway Sub-station Filter Installations And Track Circuits Caused By Traction Vehicles With Choppers, By Ore Specialists Committee A 122 | ||||
UIC A122 DT 92:1979 | Oscillation Phnenomena In The Traction Current Circuit Prepared By Ore Specialists Committee A 122 | ||||
UIC A122 DT 91:1979 | Calculation Of Interference With Track Circuits Due To Electric Traction, Prepared By Ore Specialists Committee A 122 | ||||
UIC A122 DT 73:1984 | Tests To Determine Disturbance Caused In Telecommunications Installations By Electric Traction Vehicles In A.c. (25 Kv, 50 Hz) And D.c. (3 Kv) Systems.- Part 1: Sncf Test Results Obtained On The Annemasse-st. Gervais Line (25 Kv, 50 Hz) - Part 2: Pkp Test Results Obtained On The Chabowka-skawina Line (3 Kv D.c.) | ||||
UIC A122 RP 23:1979 | Technical And Economic Assessment Of Possibilities Obtainable With Thyristor From The User's Viewpoint | ||||
UIC A122 RP 22:1977 | Study Of Interference In Telecommunications Lines Including Data Transmission With A.c. Traction | ||||
UIC A122 RP 21:1976 | Effect Of Thyristor Controlled Motive Power Units On 25 Kv, 50 Hz Power Supply Installations Of Csd | ||||
UIC A122 RP 26:1980 | Final Considerations - Comparison Of Advantages And Disadvantages | ||||
UIC A122 RP 2:1971 | Effects Caused By 16 2/3 Thyristor Controlled Motive Power Units On 100 Hz Track-circuits With Motor-type Relays | ||||
UIC A122 DT 56:1976 | Versuche Mit Der Thyristorlokomotive 184 Der Db Und Der Lokomotive E 444 Der Fs Auf Dem Streckennetz Der Fs Mit 3 Kv Gleichstrom, Vom Sva A 122 | ||||
UIC A122 RP 18:1975 | Investigation Of Interference In Track Circuits From Static Converters Used For Electric Passenger Train Heating | ||||
UIC A122 RP 20:1975 | Signal Installation Interference From The Operation Of Thyristor Controlled Traction Vehicles On The Csd Railway System | ||||
UIC A122 RP 4:1972 | Tests To Compare Thyristor-controlled Tractive Units For 16 2/3 Hz On The Same Test Track | ||||
UIC A122 RP 3:1972 | Effects Of Booster Transformers On The Magnitude And Propagation Of Harmonics Produced By Thyristor Controlled Motive Power Units | ||||
UIC A122 RP 25:1980 | Problems Of Interference With Information Systems Installations - Investigation Into The Disadvantages As Regards The Electromagnetic Compatibility Of Power And Telecommunications Installations | ||||
UIC A124 RP 11:1981 | Test Manual For Automatic Track Gang Warning Systems (aurowa) Summary Of Test Results Obtained At The Electronic Testing Installation Of Vienna-arsenal | ||||
UIC A124 RP 12:1981 | Summary Report And Possible Future Developments In Track Gang Warning Systems | ||||
UIC A124 DT 116:1982 | Installation D'Alerte Automatique A L'Approche Des Trains 'Aeg-Telefunken' Rapport D'Essais - Essais De Fonctionnement Et De Securite | ||||
UIC A124 DT 115:1982 | Automatic Train Announcement Installation 'Pintsch Bamag', Test Report - Functional Test And Safety Investigation | ||||
UIC A124 DT 117:1982 | Automatic Train Announcement Installation 'Azw 5 Siliani' - Test Report - Functional Test And Safety Investigation | ||||
UIC A122 RP 19:1976 | Thyristor Chopper Control And Harmonic Current In Traction Supply Systems | ||||
UIC A122 RP 8:1973 | Tests With A Static Frequency Converter For 50 - 16 2/3 Hz | ||||
UIC A122 RP 7:1973 | Chopper-control Systems | ||||
UIC A124 RP 10:1980 | Part I: Technical Specifications For Automatic Track Gang Warning Systems (aurowa) Part Ii: Elucidations To The Specification For An Automatic Track Gang Warning System (aurowa) | ||||
UIC A124 RP 1:1971 | Enquiry Concerning The State Of Progress And The Types Of Systems And Equipment Used By The Member Administrations Of Ore For The Automatic Warning Of Track Maintenance Gangs | ||||
UIC A129 RP 2:1975 | Light A.c. Overhead Contact Equipment For High Power Collection At Speeds Up To 300 Km/h | ||||
UIC A129 RP 1:1974 | Dynamic Behaviour Of The 'overhead Contact-pantograph' System - Comparison Between Results Of Br Simulations And Sncf Track Tests | ||||
UIC A129 DT 90:1979 | Essais A Grande Vitesse De La Db Sur La Section Gutersloh-neubeckum Pour La Determination Des Composantes Du Systeme Catenaire/pantographe (suite), Par M. Schmitt-manderbach, Bza Munich | ||||
UIC A129 DT 84:1979 | Analyse Der Parameter Fuer Gleichstrom- Abnehmer Fuer Geschwindigkeiten Von 250 - 300 Km/h, Aufgestellt Von Frau Roman (pkp) | ||||
UIC A124 DT 99:1980 | Testing Of Electro-acoustic Signal Generators To Ascertain The Possibility Of Monitoring The Safety System Of An Automatic Gang-warning System, Prepared By The Dr In Connection With The Work Of Committee A 124 | ||||
UIC A129 DT 82:1979 | High Power Traction Current Collection At High Speeds On The Rome-florence Direttissima Line In April 1978, Prepared By The Motive Power And Rolling Stock Department Of The Fs | ||||
UIC A129 DT 83:1979 | Measurement Of The Contact Force Between Pantograph And Overhead Contact System (br, Sncf And Db Methods), Established By Br, Sncf (direction Du Material - Department Mc) And Db | ||||
UIC A122 RP 6:1973 | Investigations On A.c. Motive Power Units With Several Thrysistor Circuits (tests And Results Obtained From The Bls-locomotive Re 4/4 No. 161) | ||||
UIC A133 RP 5:1980 | Radio Propagation In Tunnels (natural Propagation) | ||||
UIC A133 RP 3:1978 | Radio Propagation Along Railway Lines | ||||
UIC E18C RP 1:1958 | Final Report | ||||
UIC A129 DT 67:1977 | Feasibility Study Of The Electronic Arc As A Means Of Power Collection At High-speeds, Up To 500 Km/h, By Dr. D. Klapas, Dr. R. Hackman, Prof. F.a. Benson, Department Of Electronic And Electrical Engineering, The University Of Sheffield | ||||
UIC A129 DT 68:1978 | Equipment For Measuring The Root-mean- Square Value Of Overhead Lines Current By Mr. K. Bauer, Bza Munich, Db (part 1) And The Pkp Research Institute (part 2) | ||||
UIC A133 RP 2:1978 | Radio Propagation In Railway Stations | ||||
UIC A133 RP 1:1975 | Classification Of Railway Terrain For Radio Propagation | ||||
UIC A129 RP 9:1978 | High Current Collection At The Contact Area Between Contact Wire And Current Collector At High Speed | ||||
UIC A129 RP 8:1977 | Permissible Current Loading At The Contact Point Between Contact Wire And Current Collector At Rest And During Starting | ||||
UIC A133 RP 6:1980 | Summary Report And Designers' Guide | ||||
UIC A155 RP 7:1986 | The Design Of Computer Based Safety Systems | ||||
UIC A155 RP 5:1985 | Errors In Digital Transmission Systems |
若您对上表中数据有任何疑问,请与网站联系。