|
Seismic Behavior of Reinforced Concrete Shear Walls Subjected to High Axial Loading |
|
|
|
|
|
Effect of Axial Restraint on Mechanical Behavior of High- Strength Concrete Beams |
|
|
|
|
|
Rotating- and Fixed-Angle Crack Models in Beams Without Transverse Reinforcement |
|
|
|
|
|
Punching Shear Behavior of Restrained Ferrocement Slabs |
|
|
|
|
|
Minimum Protection and ThermalStresses in Winter Concreting |
|
|
|
|
|
Excessive Strand End Slip in Prestressed Piles |
|
|
|
|
|
Flexural Behavior of Reinforced Concrete Beams with Unbonded Repair Patch |
|
|
|
|
|
Slump loss |
|
|
|
|
|
In situ strength evaluation of con-crete |
|
|
|
|
|
In Situ strength Evaluation of ConcreteThe Break-off Method |
|
|
|
|
|
Plant Fabrication Avoids Environmental Damage to Dunes |
|
|
|
|
|
Concrete Need Not Deteriorat |
|
|
|
|
|
Steel Fibers for Controlling Crackingand Deflection |
|
|
|
|
|
Refractory Concrete: Summary ofState-of-the-Art Report |
|
|
|
|
|
Concrete Slump and Field Examples ofPlacement Problems |
|
|
|
|
|
Models of Concrete Structures-State-of-the-Art |
|
|
|
|
|
East Building National Gallery ofArt: An Adventure in Architectural Concrete |
|
|
|
|
|
I.M. Pei Speaks Out for Concrete |
|
|
|
|
|
Economical Design Solutions Save$1.8 billion |
|
|
|
|
|
Precast Water Tower in VerticallyStacked Sections |
|
|
|
|
|
Post-Compression -- Prestressing Technique |
|
|
|
|
|
Treatment of Joints in Precast Cladding |
|
|
|
|
|
Practices for Evaluation of Concrete inExisting Massive Structures for Service Conditions |
|
|
|
|
|
Out-of-Plumb Columns in ConcreteStructures |
|
|
|
|
|
Precast Columns, Cast-in-PlaceBeams Support Barrel Vault Roof |
|
|
|
|
|
Major Building Components are SpecialDesign Double Tees |
|
|
|
|
|
Long-Span Continuous ConcreteGirder Bridge Supported by Cables |
|
|
|
|
|
Precast Elements, Fast-Track ConstructionCreate an Operating Plant in 6 1/2 Months |
|
|
|
|
|
Mass Production of Highly TolerancedPrecast Concrete Tunnel Segments |
|
|
|
|
|
Philosophy of Structural Integrity ofMultistory Load-Bearing Concrete MasonryStructures |
|
|
|
|
|
Unique Design and Construction Featuresof 2,000,000 Square Feet Expansive Cementconcrete floor slab |
|
|
|
|
|
Site Precasting |
|
|
|
|
|
Practical Approach to Cast-in-PlaceConcrete |
|
|
|
|
|
Replacing Timber Decks on RailroadBridges With Prestressed Concrete Slabs |
|
|
|
|
|
Launching a Concrete Bridge Saves$200,000 |
|
|
|
|
|
Bare Reinforced Concrete Roofs; ThePuerto Rican Experience |
|
|
|
|
|
Wall system stitches a Building Together |
|
|
|
|
|
Void spacing in exposed concrete flat-work |
|
|
|
|
|
Quality Control During Hot and ColdWeather |
|
|
|
|
|
661,380 Ton Precast StructureTowed Out to Sea: The Ninian Central Platform |
|
|
|
|
|
Shubenacadie Bridge Tames Angry River |
|
|
|
|
|
Quality Attainment and Common Sensein Nuclear Concrete Construction |
|
|
|
|
|
Concrete With a Difference |
|
|
|
|
|
Camber Requirements for PretensionedMembers |
|
|
|
|
|
50-story Reunion Tower Slipformed in68 Days |
|
|
|
|
|
Concrete Construction With SeparatelyMolded Members and Costs |
|
|
|
|
|
Concrete Houses Conserve Energy,Reduce Costs |
|
|
|
|
|
Grout Testing for A Hazardous Waste Application |
|
|
|
|
|
Using ACI 318 the Easy Way |
|
|
|
|
|
Bemis Bag Plant in Winnipeg, Canada |
|
|
|
|