(清空日期可显示全部记录)
标准编号 | 标准名称 | 发布日期 | 实施日期 | 废止日期 | 替换信息 |
---|---|---|---|---|---|
DIN EN 71-1:2007 | Safety of toys - Part 1: Mechanical and physical properties; German version EN 71-1:2005+A4:2007 | ||||
关于公布资源综合利用企业所得税优惠目录(2008年版)的通知 | 2008-08-20 | 2008-01-01 | |||
DIN EN 71-1:2006 | Safety of toys - Part 1: Mechanical and physical properties; German version EN 71-1:2005 | ||||
DIN 1530-3:2011 | Tools for moulding - Part 3: Ejector pins with conical head | ||||
DIN EN 71-1/A3:2006 | Safety of toys - Part 1: Mechanical and physical properties; German version EN 71-1:2005/A3:2006 | ||||
DIN 1530-3:1988 | Ejector pins with conical head | ||||
DIN 1530-3:1969 | Ejector pins with countersunk head | ||||
DIN 15306:1985 | Lifts; passenger lifts in residential buildings; functional dimensions | ||||
中华人民共和国工业和信息化部、中华人民共和国国家发展改革委员会第10号令 | 关于停止执行《汽车产业发展政策》有关条目的决定 | 2009-08-15 | 2009-09-01 | ||
HGGF01-2014 | 大直径钢筋混凝土圆形筒仓施工工法 | 2015-03-27 | 2015-03-27 | ||
HGGF02-2014 | 花纹钢板平台无焊接施工工法 | 2015-03-27 | 2015-03-27 | ||
DB21/T2237-2013 | 建筑外保温工程施工防火安全技术规程 | 2014-03-03 | 2014-03-01 | ||
中化施协发[2015]33号 | 关于公布2013-2014年度全国化工施工工法(部级)的通知 | 2015-03-27 | 2015-03-27 | ||
HGGF03-2014 | 钢结构悬挂式脚手架施工工法 | 2015-03-27 | 2015-03-27 | ||
HGGF04-2014 | 直埋U-PVC排水管箍穿越楼层施工工法 | 2015-03-27 | 2015-03-27 | ||
工业企业建设项目卫生预评价规范 | 1994-06-30 | 1994-06-30 | |||
DIN 15400:1978 | Lifting hooks for lifting appliances; Mechanical properties, lifting capacities, stresses and materials | ||||
DIN 15401-2:1982 | Lifting hooks; shank hooks with a point; mashined lifting hooks with shank with thread | ||||
DIN 15402-2:1982 | Lifting hooks; ramshorn shank hooks; mashined ramshorn hooks with shank with thread | ||||
HGGF05-2014 | 轻集料加气混凝土砌块开孔法施工工法 | 2015-03-27 | 2015-03-27 | ||
HGGF06-2014 | 鼓泡式氧化反应器顶板施工工法 | 2015-03-27 | 2015-03-27 | ||
HGGF07-2014 | 离子膜烧碱工程大型预处理器施工工法 | 2015-03-27 | 2015-03-27 | ||
DIN 15404-1:1979 | Lifting hooks; technical conditions for forged hooks | ||||
HGGF08-2014 | 长输管道检测工法 | 2015-03-27 | 2015-03-27 | ||
HGGF09-2014 | 钻孔灌注桩后压浆施工工法 | 2015-03-27 | 2015-03-27 | ||
HGGF10-2014 | 大型飞灰过滤器滤芯内部更换工法 | 2015-03-27 | 2015-03-27 | ||
HGGF11-2014 | 大跨度铰链钢屋架结构吊装工法 | 2015-03-27 | 2015-03-27 | ||
DIN 15404-2:1979 | Lifting hooks; technical conditions for laminated hooks | ||||
HGGF12-2014 | 镍基合金Incoloy825复合钢管道焊接工法 | 2015-03-27 | 2015-03-27 | ||
HGGF13-2014 | 射线检测成像参数选择优化工法 | 2015-03-27 | 2015-03-27 | ||
DIN 15405-2:1979 | Lifting hooks; inspection of laminated hooks in service | ||||
HGGF14-2014 | 全模铸式汇流母线施工工法 | 2015-03-27 | 2015-03-27 | ||
关于颁发电力行业一流火力发电厂考核标准(修订版)的通知 | 1997-10-16 | 1997-10-16 | |||
DIN 15407-2:1977 | Lifting hooks; laminated hooks with a point for spigot ladles, component parts | ||||
HGGF15-2014 | 超限压力容器卧式热处理防变形施工工法 | 2015-03-27 | 2015-03-27 | ||
HGGF16-2014 | 反应沉降器封闭罩更换“组合模块化拆安”施工工法 | 2015-03-27 | 2015-03-27 | ||
粤卫函〔2009〕265号 | 广东省卫生厅转发卫生部关于建设项目职业卫生审查有关问题的通知 | 2009-04-27 | 2009-04-27 | ||
DIN 15411:1978 | Lifting appliances; hook assemblies for bottom hook blocks | ||||
安监总政法〔2011〕81号 | 关于印发安全生产工作创新奖励管理暂行办法的通知 | 2011-05-26 | 2011-05-26 | ||
HGGF17-2014 | 烟囱内筒液压提升施工工法 | 2015-03-27 | 2015-03-27 | ||
安监总管一〔2011〕146号 | 关于印发中央企业安全生产保障能力建设发展规划(2011-2015年)的通知 | 2011-09-16 | 2011-09-16 | ||
DIN 15412:1970 | Bottom hook blocks; crossheads for cranes | ||||
HGGF18-2014 | 插接式35KV高压开关柜安装施工工法 | 2015-03-27 | 2015-03-27 | ||
卫监督发〔2009〕24号 | 关于建设项目职业卫生审查有关问题的通知 | 2009-03-23 | 2009-06-01 | ||
HGGF19-2014 | 10万m3储罐正装施工工法 | 2015-03-27 | 2015-03-27 | ||
HGGF20-2014 | 超大型防渗混凝土水池施工工法 | 2015-03-27 | 2015-03-27 | ||
HGGF21-2014 | 9Ni钢大型LNG低温储罐焊接工法 | 2015-03-27 | 2015-03-27 | ||
交公路发〔2015〕36号 | 关于规范公路桥梁与石油天然气管道交叉工程管理的通知 | 2015-03-17 | 2015-03-17 | ||
HGGF22-2014 | 180米钢筋混凝土烟囱施工工法 | 2015-03-27 | 2015-03-27 | ||
湖北省人民政府令第327号 | 湖北省地震安全性评价管理办法 | 2008-12-30 | 2009-03-01 |
若您对上表中数据有任何疑问,请与网站联系。