(清空日期可显示全部记录)
标准编号 | 标准名称 | 发布日期 | 实施日期 | 废止日期 | 替换信息 |
---|---|---|---|---|---|
UIC C204.1 RP 3:1997 | Final Report On The Feasibility Study Into Computer Modelling Of A Fire In A Railway Vehicle | ||||
UIC C178 DT 271:1993 | An Analysis Of Signals Recorded By Sncf During Tests On The Z 7300 Bogie Using The Br Method | ||||
UIC C206.2 DT 327:1995 | Aerodynamische Belastungen Von Gueterfahrzeugen Im Mischverkehr Verfasser: H. Gloeckle (db) H.-j. Wormstall-reitschuster (db) Herausgegeben Von M. Kaminski, Erri-ingenieur | ||||
UIC C178 RP 1:1992 | Handbook For The Measurement Of Representative Service Stresses | ||||
UIC C204.1 DT 319:1995 | Results Of Additional Cone Calorimeter Tests On Seat Materials And Furniture Calorimeter Tests On Mock-up Seats By Roy Young (scientifics, A Business Within The British Railways Board) Edited By Andrzej Kaminski, Erri Technical Adviser | ||||
UIC C179 RP 9:1993 | Resume Of Test Methods To Determine The Aerodynamic Drag Of A Train In The Open Air | ||||
UIC C179 RP 5:1991 | Measurements Of The Boundary Layer Behaviour On A Train In The Open Air By Pressure Tube Techniques | ||||
UIC C179 RP 4:1991 | Part 1: Aerodynamic Behaviour Of Pantographs In Strong Cross Winds (tests In Emmen Wind Tunnel - Switzerland) - Part 2: Tables And Figures To Part 1 | ||||
UIC C204 RP 1:1994 | Progress Report On The Tests Carried Out Using A Cone Calorimeter And On The Calculations With The Hazard 1.1 Software Package | ||||
UIC C179 RP 8:1993 | Tests To Determine The Feasibility Of Using On-board Laser Anemometers To Measure The Velocities Of Airflows Around A Train | ||||
UIC C172 RP 1:1990 | Improved Curve Negotiation (final Report For Phase 1) | ||||
UIC C179 RP 3:1990 | Summary Of Replies To The Questionnaire Relating To Problems Of Strong Winds, Load Displacement And Aerodynamic Effects In The Vicinity Of The Track | ||||
UIC C179 RP 7:1992 | Determination Of The Resistance Of A Train In The Open Air Using The Coasting Method (fs And Sncf Analysis) | ||||
UIC C179 RP 6:1992 | The Determination Of Train Resistance On Open Track Using Techniques Adopted By Db | ||||
UIC C163 SP 1:1999 | Draft Proposal For Noise Measurement Standard For Erri Project C 163 - Origin Number: Rr-sps-97-012 Issue 1 | ||||
UIC C178 DT 270:1993 | Z 7300 (z2) Motor Bogie Measurement Of Stresses On The Under- Frame | ||||
UIC C163 RP 9:1988 | Wheel/rail Contact Noise - An Experimental Comparison Of Various Systems For Measuring The Rail Roughness | ||||
UIC C167 RP 9:1987 | An Investigation Into The Thermal Effects Produced By The Transit Of A Single Train Through A Tunnel (patchway Tunnel) | ||||
UIC C218 RP 8:2001 | Pc Program Sealtun 2.0 User Manual For The Cd-rom Accompanying The Uic Fiche On Aerodynamic Sizing Of Railway Tunnels For Sealed Train Operation | ||||
UIC C218 RP 6:1999 | Trends And Benefits Based On Train Borne Pressure Changes Of Incorporating Airshafts Into Railway Tunnels | ||||
UIC C167 DT 188:1986 | Report On A Study Trip To Japan Organised By Ore On The Subject Of Problems Caused By Trains Running At High Speed In Tunnels, By Messrs. Gawthorpe, Glockle, Holzl | ||||
UIC C218 RP 4:1998 | Technical Review Of Tunnel Pressure Alleviation Devices | ||||
UIC C218 RP 2:1998 | Draft Uic Leaflet For Sealed Train Operations - Determination Of Railway Tunnel Cross-sectional Areas For Sealed Trains On The Basis Of Aerodynamics Considerations | ||||
UIC C218 RP 1:1999 | Base-line Comfort Criteria - A 'base-line' Pressure Comfort Criterion For Unsealed And Sealed Train Operation In Tunnels | ||||
UIC C218 DT 367:1999 | Tunnel Pressure Alleviation Systems Bibliography | ||||
UIC C209 DT 337:1997 | Verification Of The Applicability Of Draft Uic Leaflet 518 To Rolling Stock For Speeds Above 200 Km/h | ||||
UIC C209 RP 2:1999 | Verification Of The Applicability Of Uic Leaflet 518 Final Report | ||||
UIC C163 RP 8:1987 | Wheel/rail Contact Noise - Further Comparative Analysis Of Noise, Vibration And Roughness Data | ||||
UIC C206.2 DT 352:1997 | Aerodynamic Stress On Freight Wagons When Encountering High-speed Passenger Trains In Tunnels - Assessment Of The Actual Situation | ||||
UIC C152 DT 136:1982 | Vehicle/track Interaction - Theory And Applications Of The Multiple Input/ Single Output Method, By C. Esveld (ns) W. Kosieradzki (pkp) And A. Peerboom (ns) | ||||
UIC C167 RP 8:1986 | Test Rig Study On The Penetration Of Noise Into Railway Vehicles | ||||
UIC C149 RP 10:1985 | Tests For The Evaluation Of The Subjective Effects On The Human Ear Caused By Trains Running At High Speeds In Tunnels | ||||
UIC C204.1 DT 301:1994 | Results Of Laboratory Tests Using A Cone Calorimeter To Provide Input Data For Computations By Mr Roy Young (british Rail) | ||||
UIC C163 RP 7:1986 | Wheel/rail Contact Noise - Comparative Study Between Theoretical Model And Measured Results | ||||
UIC C149 RP 1:1980 | Theoretical Prediction Methods For Calculating Unsteady Flows In Railway Tunnels | ||||
UIC C209 RP 1:1997 | Verification Of The Applicability Of Uic Leaflet 518 - Progress Report As Per 1 July 1997 | ||||
UIC C209 DT 370:1998 | Verification Of The Applicability Of The Simplified Method Of Uic Leaflet 518 | ||||
UIC C206.2 DT 328:1995 | Variations De Pression Et Sollicitations Sur Les Wagons Lors Des Croisements Avec Des Trains De Voyageurs Dans Les Tunnels Auteur: M. Malfatti (fs) Edite Par M. Kaminski, Conseiller Technique A L'erri | ||||
UIC C143 RP 1:1976 | Problems Encountered By The Railway Administrations In The Field Of Environmental Pollution (report Of Enquiry) | ||||
UIC C138 DT 104:1980 | Rail Force Stresses Due To Y And Q Forces Computation Methods By J.w. Dubbeldam (ns) | ||||
UIC C209 DT 338:1997 | Verification Of The Applicability Of Uic Leaflet 518 Concerning Rolling Stock For Operating Speeds Of 140 Km/h - 200 Km/h | ||||
UIC C178 DT 269:1993 | An Analysis Of Signals Recorded By Sncf During Tests On The Z 7300 Bogie Using The Pkp Method | ||||
UIC C209 DT 339:1997 | Verification Of The Applicability Of Uic Leaflet 518 Concerning Rolling Stock For Speeds Below 140 Km/h | ||||
UIC C149 RP 12:1984 | Aerodynamic Measurements In The Des Bachees Tunnel | ||||
UIC C224 RP 1:2000 | Summary Of Basnoise Investigation | ||||
UIC C53 RP 1:1964 | Preliminary Calculations | ||||
UIC C53 RP 2:1965 | Three-dimensional Photo-elastic Study Of A Loaded But Non-bent Rail | ||||
UIC C53 RP 10:1976 | 1: Residual Stresses In Rails (additional Measurements) - 2: Checking Of The Fatigue Criterion Proposed By Mr. Dang Van (additional Measurements) - 3: Relationships Between Dynamic Wheel- Load And Wheel Diameter - 4: General Conclusions | ||||
UIC C53 RP 9:1973 | Calculation Of Complex Stress Cycles In The Rail Subjected To Rolling Loads Assessment Of The Danger Of Damage (continued) | ||||
UIC C53 RP 3:1966 | Enquiry Into The Problem Of Small Diameter Wheels |
若您对上表中数据有任何疑问,请与网站联系。